Ultra Long Duration Energy Storage Project Development Studies
Innovate UK
What it funds
Funding for project-development studies supporting electrochemical ultra-long-duration energy-storage demonstrators capable of at least 100 hours continuous discharge and a 25-year working life.
Who can apply
UK registered businesses may apply for Phase 1 studies covering technology, engineering, scale-up, market, development, manufacturing and supply-chain plans.
Last checked against the official source: 17 Aug 2026. Scheme parameters are set by the funder and can change — verify before applying, or let us do it for you.
Related schemes
Growth Guarantee Scheme
British Business Bank
Successor to the Recovery Loan Scheme: government-backed guarantee enabling term loans, overdrafts and asset finance up to £2m for smaller UK businesses through accredited lenders.
Boiler Upgrade Scheme
Department for Energy Security and Net Zero
The Boiler Upgrade Scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps, ground source heat pumps and, in limited circumstances, biomass boilers. You can get:£7,500 off the cost and installation of an air source heat pump£7,500 off the cost and installation of a ground source heat pump£5,000 off the cost and installation of a biomass boilerThese grants help property owners overc
Business Growth West Midlands Programmes
West Midlands Combined Authority
Regional business-support service for West Midlands SMEs with funded advice and periodic capital/revenue grant programmes (historically £2.5k-£100k waves) for growth, decarbonisation and digital projects.